ohio epa npdes permit search


EPA State Formal Enforcement Actions No Restrictions Within None Within 1 2 3 4 5 Year (s) By Agency: Any EPA State Penalties Environmental Conditions View More Nonattainment Area for Any Pollutant No Restrictions Nonattainment Status Nonattainment or Maintenance Status None Discharging into Impaired Waters No Restrictions Yes No Pollutant The Phase II regulations address stormwater runoff of MS4s serving populations less than 100,000, called small MS4s. Click here to view the list of public and industrial wastewater treatment facilities in the state of Ohio that currently hold National Pollutant Discharge Elimination System (NPDES) permits through the Division of Surface Water. Stormwater Sampling Guidance Document | US EPA, NPDES, 1992 Use the map below to find information about NPDES permits in a particular state or territory. Butler, Clark, Darke, Hamilton, Logan, Miami, and Montgomery, Brown, Champaign, Clermont, Clinton, Greene, Preble, Shelby, and Warren, Allen, Auglaize, Defiance, Fulton, Hancock, Hardin, Henry, Marion, Mercer, Paulding, Putnam, Van Wert, Williams, and Wood, Ashland, Crawford, Erie, Huron, Lucas, Ottawa, Richland, Sandusky, Seneca, and Wyandot, adding pollutants, especially sediment, to rainwater running off of construction sites during construction; and. Significant Permit Modification (SPM) Applies to Title V only to change existing permit requirements during the permit term that result in less stringent limits or monitoring record keeping or reporting (MR or R), or result in significantly different MR or R. Minor Permit Modification (MPM) Applies to Title V only to make minor, non-typographical changes to existing permit requirements during the permit term. Search Public Notices | US EPA Dischargers Covered Under Non -StormwaterWastewater Discharge General Permits, Dischargers Covered Under StormwaterDischarge General Permits, Ohio Environmental Protection Agency| 50 W. Town St., Suite 700Columbus, OH 43215 | Call: 614-644-3020, Ohio General Permit for Filling Category 1 and Category 2 Isolated Wetlands, General Permit-to-Install Gravity Sewer Extensions, General Permit-to-Install for Land Application of Hydro-Demolition Wastewater, Construction Stormwater Discharges from Oil and Gas Linear Transmission Line and Gathering Line Installation, Hydrostatic Test Water General Permit renewal, Ohio NPDESGeneral Permits rules (OACChapter 3745-38), Small Sanitary Discharges That Cannot Meet BADCT Standards, Stormwater Discharges Associated with Industrial Activity From Marinas, Industrial Storm Water NOI Total Fee Due = $350.00, Marina Storm Water Total Fee Due = $350.00, OHB000002 Table 001, Type A or Type B facilities, OHH000002 Table 001, Discharge from new/unused pipes & tanks, OHH000002 Table 002, Discharge from used pipes & tanks, OHK000002 Table A.1, Non-lake Erie dischargers, OHK000002 Table A.2, Lake Erie direct dischargers, OHN000004 Table 002, Flow 10,000 99,999 gpd, OHN000004 Table 003, Flow 100,000 gpd or more, OHS000004 Table 001, Non-lagoons, not Ohio R., flow 5,000 gpd or more, OHS000004 Table 002, Non-lagoons, Ohio R. direct, flow 5,000 gpd or more, OHS000004 Table 003, Non-lagoons, not Ohio R., flow 1,500-4,999 gpd, OHS000004 Table 004, Non-lagoons, Ohio R. direct, flow 1,500-4,999 gpd, OHS000004 Table 005, Non-lagoons, not Ohio R., flow 1-1,499 gpd, OHS000004 Table 006, Non-lagoons, Ohio R. direct, flow 1-1,499 gpd, OHS000004 Table 001, Continuous Discharge Lagoons, OHU000005 Table 001, Low to medium hardness watersheds, OHU000005 Table 002, Medium to high hardness watersheds.

Dark Middle Room Victorian Terrace, Central Transport International Tracking, Low Income Senior Housing Independence, Mo, Does Milk Glass Contain Lead, Sunset Funeral Home El Paso, Articles O